![]() |
||
|
A 26 foot long 2 foot diameter tubular cement form has been lowered over the internal rebar support structure. The lower edge of the tube fits perfectly within the circular depression within the pier base. The form has been leveled and braced throughout its length to avoid any tendency for the tube to tilt, bulge or worse, to lift up when filling it with cement.
|
||
Arrakis
Observatory
©2002